iden(021) 29407040 Mon - Friday : 08:00 - 17:00
info@energyequity.co.id

Production Operation

Sengkang Migas Block

Energy Equity Epic Sengkang Pty. Ltd. (EEES) operates the Sengkang Oil and Gas Block located in Wajo Regency, South Sulawesi in 1995 starting with the signing of the first PSC Contract, with a Working Area (WK) of 2,925.19 Km. Exploration activities for the Sengkang Oil and Gas Block began in 1976 by BP Development of Indonesia Ltd. and succeeded in finding initial gas reserves of around 600 BCF in the Kampung Baru Field.

Production Gas Field

Currently EEES has 2 production gas fields. Kampung Baru and Wasambo fields. For the Kampung Baru Gas Field, there are 3 gas production wells each in Poleonro Village, Lamata and Macanang Subdistrict with a Central Gas Processing Plant(CPP) with a capacity of 2×35 MMscfd located in Kampung Baru Hamlet, Poleonro Village, Gilireng District. Gas production from the Kampung Baru Gas Field is intended to supply fuel for the Sengkang PLTGU with a capacity of 315 MW located in Patila Village, Kec. Pammana, Kab. Wajo to meet the electricity needs of South Sulawesi and its surroundings. Besides that, the current gas production from the Kampung Baru Field also supplies the Household Gas Network for the city of Sengkang, Kab. Wajo and its surroundings with a total of 15,721 connections equivalent to 0.5-1 MMscfd. Since starting production in 1997, the Kampung Baru Gas Field has produced 278 BCF as of October 31, 2022 from 505 BCF of proven 2P reserves.

The South Walanga, Sampi-sampi & Bonge (WASAMBO) Gas Fields are located in Lamiku Village and Liu Village, Majauleng District. In 2015, this gas field had 4 wells ready to produce. Production of the Wasambo Gas Field is planned to supply gas for the LNG Plant with a capacity of 0.5-2 MTPA operated by PT South Sulawesi LNG located in Keera District, Kab. Wajo. The Wasambo Gas Field is currently not in production and is still waiting for commercial readiness in the downstream sector.